Stability of Reinforcement Cages Prior to Concreting Document: TWf2013: 01 (Published: October 2013)

Addendum

3.2.1 Spacing of mats
“… It is suggested that the effective length ...

Attachments
2 years ago
1 person recommends this.

Synopsis

This Guide is written to provide clients, and all those with responsibility for construction, with insight into the subject of temporary works. It is set out in five Articles covering ...

Attachments
2 years ago
Be the first person to recommend this.

Synopsis

Historically, the majority of temporary works in the UK have been designed to British Standards using permissible stress methods. The harmonization of European structural ...

Attachments
2 years ago
Be the first person to recommend this.

IMPORTANT NOTE
This document has been partially superseded by Temporary condition of reinforcement cages prior to concreting: Part 1 - Management guidance (Ref.: TWf2020: 03 (October ...

Attachments
2 years ago
Be the first person to recommend this.

Within the Construction (Design and Management) Regulations 2015 (CDM 2015), temporary works designers (TWDs) are covered by the definition of ‘designer’ (see Paragraph 72 of the Legal ...

Attachments
2 years ago
Be the first person to recommend this.

Preamble

The management of temporary loads and temporary conditions is intimately bound up with temporary works, as the title of this document implies, and the three aspects of construction ...