The results from some "proof of concept" testing commissioned by the Temporary Works Forum (TWf):

A simple test rig was developed to load test 90 No. rebar ties installed on three different rebar sizes to failure (T12, T20
and T32), in three different configurations (10 No. tests on each type of rebar). Report No. SC-2909-RTT-01, 15/09/22

Based on this, further testing was undertaken by a Tier 1 Contactor. (Results to be made available in due course.)



Disclaimer
Although the Temporary Works Forum (TWf) does its best to ensure that any advice, recommendations or information it may give either in this publication or elsewhere is accurate, no liability or responsibility of any kind (including liability for negligence) howsoever and from whatsoever cause arising, is accepted in this respect by the Forum, its servants or agents. Readers should note that any documents referenced may be subject to revision from time to time and should therefore ensure that they are in possession of the latest version.


#TWf
#rebar
#tie
#testting
#testing
#report

Statistics
0 Favorited
34 Views
1 Files
0 Shares
34 Downloads
Attachment(s)
pdf file
SC-2909-RTT-01   15.25 MB   1 version
Uploaded - 11-05-2023
TWf Rebar tie testing report (Rev 2)

Related Entries and Links

No Related Resource entered.