TW23.080 (12.6.23) TWf INFORMATION SHEET No. 18 Edge protection and Demarcation: Types and their use Temporary edge protection and/or demarcation is ‘temporary works’ and requires a design in accordance with your project’s temporary works procedures. This may be a ‘standard design’. A...
TW23.080_TWf Information Sheet No 18_Edge protection and demarcation_12.6.23.pdf
The results from some "proof of concept" testing commissioned by the Temporary Works Forum (TWf): A simple test rig was developed to load test 90 No. rebar ties installed on three different rebar sizes to failure (T12, T20 and T32), in three different configurations (10 No. tests on each type...
SC-2909-RTT-01 TWF Rebar Tie Testing Report - Revision 02.pdf
TWf appoints Operations Director The Temporary Works Forum (TWf) is pleased to announce the appointment of Robin James to the role of TWf Operations Director. Robin says: “I’d like to take this opportunity to introduce myself to the TWf members, and the wider temporary works community. ...
The safe management of temporary works The basics for small and medium-sized enterprises (SMEs) Updated: 24 April 2023 (Rev. A) #informationsheet #temporaryworks #SMEs #management #TWf #information #sheet #no.6 #safe #of
TW19.010_Information Sheet No 6_The safe management of temporary works_Rev A_24.4.23.pdf