Temporary condition of reinforcement cages prior to concretingPart 1 - Management guidancePrior to being encased in concrete a reinforcement cage should be considered as an item of ‘temporary works’. This guide seeks to highlight the risks associated with the temporary condition of reinforcement cages; whether the cages is constructed in-situ or prefabricated.Consideration is given to assembling, transporting, lifting and rotating cages into their final position. Generalised guidance is provided on how to identify and manage the risks; the division of responsibility; and some practical measures to prevent problems and accidents.6.11.20