Forgot password? Click here.

PAS 8811 Code of practice for temporary works – Client procedures (June 2015)

Public consultation

This PAS arises from a number of concerns and specifically the work of High Speed Two (HS2) and the Temporary Works Forum (TWf). HS2 is committed to the implementation of the UK HM Treasury Infrastructure UK Cost Review – 2010 & 2014 and the Institution of Civil Engineers Industry Standards Group – Specifying Successful Standards ‐ July 2012, which recommended updating and defining standards. HS2 is keen for this document to be used industry-wide and hence ensured that the industry was represented by the steering group.

THIS CONSULTATION HAS CLOSED. PUBLICATION IS AWAITED.

The draft can be found at: http://drafts.bsigroup.com/Home/Details/54833

The deadline for comments, at BSI, is Thursday 16th July

The document draws upon TWf's, Clients’ guide to temporary works (TWf2014:02)